Prometric Texas Underground Construction Certification Package

$619.84

Vendor: brown-states

Product type: Packages

This exam has 50 questions and is open book. You have a 2-½ hour time limit with a minimum passing score of 70%.

Scope – Tests a candidate’s knowledge of the installation, maintenance, repair, alteration, and extension of underground utilities.

The following references are allowed in the testing center. 
Code of Federal Regulations, Title 29, Part 1926, (OSHA)
OSHA Excerpts for Contractors

The following references were used to create exam questions but are not allowed in the testing center. 
AWWA Standard for Installation of Ductile Iron Water Mains and their Appurtenances C600-99
AWWA Standard for Welded Steel Tanks for Water Storage, D100-96
AWWA Standard for Polyvinyl Chloride (PVC) Pressure Pipe, 4 in. through 12 in., for Water Distribution ANSI/AWWA, C900-89
Installation Guide for Ductile Iron Pipe
Concrete Pipe Installation Manual
Excavation and Grading Handbook
Pipe and Excavation Contracting

All test questions are the property of Prometric Inc. and are protected by copyright. Federal law provides severe civil and criminal penalties for the unauthorized reproduction, distribution, or exhibition of copyrighted materials.

|title=Reference Materials|code-of-federal-regulations-29-cfr-part-1926-osha|osha-excerpts-for-contractors-from-title-26-cfr-parts-1926-1910-fourth-edition|standard-for-installation-of-ductile-iron-water-mains-and-their-appurtances|awwa-d100-05-welded-steel-tanks-for-water-storage|awwa-standard-for-polyvinyl-chloride-pvc-pressure-pipe-4-in-through-12-in-for-water-distribution-ansi-awwa-c900-89-1989-edition|installation-guide-for-ductile-iron-pipe|concrete-pipe-box-culvert-installation-2007|excavation-and-grading-handbook|pipe-excavation-contracting-1|title=Application Assistance|application-service|

Need help Finding a Product or assistance with an Order ?

3 ways to get support:

To Top